Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1. Engines 2F and 3F-E
   - 3.2. The verhneklapannyj engine 1FZ-FE
      3.2.1. Technical characteristics
      3.2.2. Kinds of repair without engine dismantle
      3.2.3. A cover of a head of cylinders
      3.2.4. A soaking up collector
      3.2.5. A final collector
      3.2.6. Cam-shafts and pushers
      3.2.7. A head of cylinders
      3.2.8. A cover of a chain drive of cam-shafts
      3.2.9. A forward epiploon коленвала
      3.2.10. The oil pallet
      3.2.11. The oil pump
      3.2.12. A flywheel (a leading disk of the hydrotransformer)
      3.2.13. A back epiploon коленвала
      3.2.14. Suspension bracket and engine details
   + 3.3. Dismantle and engine major repairs
   + 3.4. An engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and a steering
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes


3.2.12. A flywheel (a leading disk of the hydrotransformer) Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight. Lift the car and establish on supports. Remove transmission (check point).
2. Remove coupling.
3. Designate labels flywheel position rather коленвала.
4. Turn away flywheel bolts (a leading disk of the hydrotransformer). Fix a flywheel from проворачивания, having rested a screw-driver against a gear wreath.
5. Cautiously remove a flywheel (a leading disk of the hydrotransformer). On some cars with automatic transmission on both parties of a leading disk remote washers which store together with a disk are established.

Installation

PERFORMANCE ORDER
1. Clear a flywheel, check up presence on a surface of traces of deep development, furrows from rivets, traces of burning out and scratches. Insignificant damages can be eliminated зачисткой a skin. Check up deformation of a plane of a flywheel.
2. Clear and check up a condition of a plane of a socket of a flywheel and коленвала. If it is revealed that the back epiploon коленвала springs a leak before establishing a flywheel (a leading disk) replace an epiploon.
3. Establish a flywheel (a leading disk of the hydrotransformer) on коленвал. Combine the labels put at removal. Before заворачиванием bolts grease carvings with fixing structure.
4. Fix a flywheel a screw-driver for a gear wreath and tighten bolts of fastening with the set moment. Tighten opposite bolts. A definitive inhaling execute for three-four stages.
5. Further assemblage is carried out upside-down.