Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1. Engines 2F and 3F-E
   - 3.2. The verhneklapannyj engine 1FZ-FE
      3.2.1. Technical characteristics
      3.2.2. Kinds of repair without engine dismantle
      3.2.3. A cover of a head of cylinders
      3.2.4. A soaking up collector
      3.2.5. A final collector
      3.2.6. Cam-shafts and pushers
      3.2.7. A head of cylinders
      3.2.8. A cover of a chain drive of cam-shafts
      3.2.9. A forward epiploon коленвала
      3.2.10. The oil pallet
      3.2.11. The oil pump
      3.2.12. A flywheel (a leading disk of the hydrotransformer)
      3.2.13. A back epiploon коленвала
      3.2.14. Suspension bracket and engine details
   + 3.3. Dismantle and engine major repairs
   + 3.4. An engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and a steering
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes


3.2.5. A final collector
THE GENERAL DATA

The prevention

Works are carried out on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. On the engines equipped with PAIR-system (pulse system of injection of fuel) remove system of tubes and the valves close to a collector.
3. Remove thermal screens (bolts of the thermal screen of a final collector are specified by arrows).
4. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with a getting liquid. After wetting turn away a nut of an exhaust pipe.
5. Turn away a nut (are specified стsрелками) and remove a collector and a lining.

Installation

PERFORMANCE ORDER
1. Clear demountable planes of a collector and a head of cylinders of the rests of a material of a lining and deposit adjournment. If leak signs through a lining check up deformation of a demountable plane of a collector in a specialised workshop, if necessary прошлифуйте are observed.
2. Dress on hairpins of a head of cylinders a new lining.
The prevention

Labels on a lining should be turned aside from a head of cylinders.


3. Establish a collector and wrap nuts on former places.
4. In regular intervals tighten nuts in three-four receptions with the set moment (subsection 3.2.1 see). Tighten bolts and nuts from the centre to collector periphery.
5. Establish other details as it should be the return to dismantling.
6. Start the engine and check up tightness of connections of a final collector.