Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1. Engines 2F and 3F-E
   - 3.2. The verhneklapannyj engine 1FZ-FE
      3.2.1. Technical characteristics
      3.2.2. Kinds of repair without engine dismantle
      3.2.3. A cover of a head of cylinders
      3.2.4. A soaking up collector
      3.2.5. A final collector
      3.2.6. Cam-shafts and pushers
      3.2.7. A head of cylinders
      3.2.8. A cover of a chain drive of cam-shafts
      3.2.9. A forward epiploon коленвала
      3.2.10. The oil pallet
      3.2.11. The oil pump
      3.2.12. A flywheel (a leading disk of the hydrotransformer)
      3.2.13. A back epiploon коленвала
      3.2.14. Suspension bracket and engine details
   + 3.3. Dismantle and engine major repairs
   + 3.4. An engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and a steering
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes


3.2.13. A back epiploon коленвала Replacement

PERFORMANCE ORDER
1. Remove a check point (transmission). Remove a back plate.
2. The epiploon can be removed without dismantle of the oil pallet or removal of the holder of an epiploon. However, such way is not recommended, as the epiploon is established in the holder with the big tightness and consequently it is possible to damage an epiploon or in the holder, or at installation. If you nevertheless wish to try, a screw-driver take an old epiploon.
3. Grease a neck коленвала and working edges of a new epiploon universal консистентной with greasing and cautiously establish an epiploon into place. A working edge of an epiploon very rigid, therefore at installation on коленвал push an epiploon cautiously, operating with a smooth subject. Easy blows запрессуйте an epiploon into place. Sharp blows do not put, otherwise the epiploon can be damaged.
4. It is recommended to apply a method which is described more low. However, here it is required to open consolidation in a back part of the pallet and to remove the holder of an epiploon.
5. Turn away two extreme back bolts of the pallet which are screwed in the holder. Шпателем open consolidation between a back part of the pallet and the holder of an epiploon.
6. Turn away bolts, remove the holder and remove the lining rests. Remove consolidation from a demountable plane of the pallet.
The prevention

Open part of the pallet close pure rags that the rests of consolidation have not got during pallet fastening at assemblage.


7. Having put to the holder with an epiploon on two wooden бруска, beat out an epiploon a screw-driver from an underside.
8. Запрессуйте in the holder a new epiploon hammer blows through the wooden prorate.
9. Grease working edges of a new epiploon and a neck коленвала universal консистентной with greasing. Establish a new lining of the holder of an epiploon on the block of cylinders. On the opened part масляныого the pallet put the platen of hermetic RTV, especially on a plane adjoining to the block of cylinders.
10. Cautiously dress an epiploon with the holder on a neck коленвала.
11. Tighten bolts of the holder with the set moment.
12. Further assemblage is carried out upside-down.